Infrastructure

Power, Water & Infrastructure

Data centers have significant infrastructure requirements. Understanding how these are managed — and what safeguards exist — is essential for informed community discussion.

Electric Power

Concerns About Electric Bill Increases

In some states, data center development has contributed to higher electric bills for residents when infrastructure costs were spread across all customers. Kansas has taken steps to address this:

  • Kansas law requires cost responsibility: Data centers pay the full cost of their power usage with no discounted electricity rates.
  • Kansas protections (Nov 2025): The Kansas Corporation Commission approved new rules requiring large power users to pay for their own transmission lines and operate under separate rate structures from residential customers.
  • Federal proposal (Jan 2026): The Trump administration proposed policies requiring data centers to fund new power generation, specifically to protect residential ratepayers.

Grid Impact

Before any major load is added to the grid, utilities conduct interconnection studies to assess capacity and determine required upgrades. For projects of this scale, those upgrades are required to be funded by the project developer.

Water Use

Closed-Loop Cooling Systems

Modern large-scale data centers most commonly use closed-loop cooling systems. These systems recirculate the same water through the cooling loop continuously, rather than drawing fresh water on every cycle.

What Happens to the Water

Water discharged from the cooling system is properly treated — similar to how a municipal wastewater treatment plant operates — and is then either safely released or made available for reuse in other industrial applications.

El Dorado's Unique Water Position

El Dorado has a water system unusually well-suited for evaluating large industrial proposals:

  • Firm water supply: Approximately 10 million gallons per day available for industrial use
  • Reservoir-based: El Dorado Reservoir provides long-term planning certainty
  • Direct control: The city is the sole owner of its water system and contracts directly with the U.S. Army Corps of Engineers
  • Revenue opportunity: Water sales to industrial users create a revenue stream for the city that can support local services and infrastructure
  • Capacity study: The City completed a feasibility study with Black & Veatch confirming the ability to sell an additional 8.5 billion gallons per year beyond current sales

Infrastructure Footprint

Factor Data Center Manufacturing Plant
Road TrafficMinimal (small staff, few deliveries)Significant (large workforce, supply chain)
Housing DemandLow (dozens to hundreds of jobs)High (thousands of workers)
School ImpactMinimalSignificant growth pressure
City ServicesLimited demandSubstantial increase

A Proven Track Record

Ashburn, Virginia is the data center capital of the world, home to 100–200 facilities. It is one of the most desirable communities in the country — not despite the data centers, but in part because of the infrastructure investment they brought.

The industry's track record across thousands of operational facilities demonstrates that — with proper planning — these concerns are manageable and the benefits are real.

Key Safeguards

Utility Coordination

Grid studies and capacity planning before approval

Cost Allocation

Large users typically pay for their infrastructure needs

Water Planning

Usage must fit within long-term community water plans

Regulatory Oversight

State and federal agencies review major utility changes

Want to See Inside a Data Center?

Linus Tech Tips produced an unbiased tour of an Equinix data center. It's a good way to understand what these facilities actually look like.

Watch the Tour on YouTube ↗
Next: Community Concerns & Safety →